Kaizen Steel Building Solutions Private Limited is an RDSO-approved vendor for the fabrication of steel bridge girders, registered with the Ministry of Railways (RDSO). Our manufacturing facility at Purkhas Rathi, Ganaur, Sonipat, Haryana is certified to ISO 9001:2015 and registered under the Udyam (MSME) scheme. This section of our website provides the ownership, facility, certification, and compliance information required under RDSO's Source Registration norms.
| Legal Name | Kaizen Steel Building Solutions Private Limited |
| Originally Incorporated As | Babaji Agrotech Private Limited |
| Name Changed To Current Name | Effective 7 August 2017 (Certificate of Incorporation pursuant to change of name, issued by RoC Delhi) |
| Corporate Identification Number (CIN) | U15122DL2015PTC280691 |
| Date of Original Incorporation | 25 May 2015 |
| Company Type | Private Limited Company, limited by shares |
| Registered Office (as per RoC record) | National Capital Territory of Delhi |
| Sr. No. | Name of Director | DIN No. |
|---|---|---|
| 1 | Noni Garg | 07151305 |
| 2 | Shivam S Garg | 08154328 |
| 3 | Shivank Garg | 07890663 |
362, 3rd floor, kohat enclave, pitampura Delhi 110034
| State | GSTIN | Effective From |
|---|---|---|
| Delhi | 07AAGCB3178B1ZY | 23/09/2017 |
| Haryana | 06AAGCB3178B1Z0 | 13/06/2022 |
| Item/Tab | Information/Sub-tab | Information/Sub-tab |
|---|---|---|
| Ownership details | Ownership, Board of Director-Partners Registration / Incorporation details. Memorandum and Article of Association/partnership deed/LLP agreement Registration address Contact information | Kaizen Steel Building Solutions Pvt. Ltd. Private Limited Company (Directors – Mr. Shivank Garg, Mr. Shivam Garg, Mrs. Noni Garg) Reg. Add – 362, 3rd Floor, Kohat Enclave, Pitampura, Delhi - 110034 Email ID: [email protected] Contact No. +91-8750000131 |
| Documents | Certificate of Incorporation List of Directors | |
| Item/Tab | Information/Sub-tab | Information/Sub-tab |
|---|---|---|
| Ownership details | Ownership, Board of Director-Partners Registration / Incorporation details. Memorandum and Article of Association/partnership deed/LLP agreement Registration address Contact information | MEMORANDUM OF ASSOCIATION |
| Documents | MEMORANDUM OF ASSOCIATION | |
| Item/Tab | Information/Sub-tab | Information/Sub-tab |
|---|---|---|
| Ownership details | Ownership, Board of Director-Partners Registration / Incorporation details. Memorandum and Article of Association/partnership deed/LLP agreement Registration address Contact information | ARTICLE OF ASSOCIATION |
| Documents | ARTICLE OF ASSOCIATION | |
| RDSO-Approved Manufacturing Unit (Unit-I) | Kila No. 63/6, 63/7 (registered factory license additionally covers Killa No. 54/25/2, 63/4/1, 4/2, 5/1, 5/2, 6 & 7), Village Purkhas Rathi, Tehsil Ganaur, District Sonipat, Haryana – 131102 |
| Additional Manufacturing Location (Kailana) | Kila No. 13//10, 11/1, 2.12/1, 2, 18, 19/1/2, 20–22, 28//1, Kailana, Ganaur, District Sonipat, Haryana – 131102 |
| Sales/Design Office | 362, 3rd floor, kohat enclave, pitampura delhi 110034 |
| Item/Tab | Information/Sub-tab | Information/Sub-tab |
|---|---|---|
| Fabrication facilities (for each unit) | Address | Factory Address: Kaizen Steel Building Solutions Private limited, Kila No. 63/6, 63/7, Purkhas Rathi, Ganaur, Sonipat, Haryana 131102 GSTIN: 06AAGCB3178B1Z0 Email ID: [email protected] Contact No.: +91-8750000131 |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 1. Template layout area - 900Sqm 2. Fabrication shop - Cutting, Drilling, Welding, Straightening, End milling etc. - 1800Sqm 3. Blasting area - 900Sqm 4. Metalizing & Painting shop - 900Sqm 5. Assembly area - 1800Sqm 6. Stacking area - 2000Sqm 7. Any other facility/area/shop - 1000Sqm |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 1. Template layout area - 900Sqm ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 2. Fabrication shop - Cutting, Drilling, Welding, Straightening, End milling etc. - 1800Sqm 2a. Pug Cutting Machine – Very commonly used for flame cutting of MS plates and Structures for thickness range up to 150mm. With a guide track, cutting can easily be done in straight line as well as for long or short radius. Machine is also having a provision for bevel cutting. ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 2a. CNC Plasma Cutting Machine – 02 Nos. High precision cutting machine with latest software for nesting planning which minimise scrap generation. Straight & profile cutting with high speed is easily possible. ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 3. CNC Drilling Machine – High Speed drilling machine up to 50mm Dia. Used for precise hole drilling in templates and production splice plates within tolerances. Working size 1.6m x 3.0m. ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 4. Radial Drilling Machine – 02 Nos. A heavy duty drilling machine used for drilling large diameter holes in thick plates and fabricated members. It is suitable for components requiring flexibility in drilling positions and handling large structural sections. ![]() ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 5. Magnetic Core Cutting Machine – 10 Nos. Used for efficient hole cutting within tolerance in structural steel members and can easily be operated at any position by a single person either at site or workshop. ![]() ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 6. Automatic SAW Welding Machine – A complete welding line machine for beam fit-up and SAW welding using double head with twin wire system. It is also having manipulators for 2nd side welding. ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 7. Double Head SAW Welding Machine - Welding machine with 45-degree fixtures both sides, is particularly used in girders for long seam welding. This process is mostly used for deep penetration, uniform weld quality, high deposition, multi-runs. ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 8. MIG Welding Machines – Metal Inert Gas (MIG) or Flux Cored Arc Welding (FCAW) machines are used for high-quality welding of structural steel components. This welding ensures strong weld joints, better penetration and highly productivity. ![]() ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 9. Straightening Machine – After welding, flanges are having warpage. For warpage removal, this machine is specially designed and can do up to 80mm thick plate straightening. ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 10. End Milling Machine – After fabrication and before assembly, matching surfaces need proper alignment by this machining process which maintain a proper joints of members within specified tolerance during assembly of girders. ![]() ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 11. Blasting Machine – Automatic blasting facility available for surface preparation of steel components. Grit/Shot blasting remove rust, mill scale, oil or any contaminants to achieve the required surface cleanliness and roughness before metalizing & painting. ![]() |
| Fabrication facilities (for each unit) | Facilities including details of Surface Comparator SA2.5 | ![]() ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 12. Metalizing is a process to provide a protective coating to the steel surfaces from corrosion. Metalizing enhances durability and extends service life of steel bridge components. ![]() ![]() |
| Fabrication facilities (for each unit) | Facilities including details of Surface Roughness Tester | ![]() ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 13. Painting Shop – Using Airless painting machine and agitator for mixing with qualified painter. A controlled painting facility used for application of primer & painting. Coating thickness ensures with a regular checking with DFT gauge after each coat. ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 14. Assembly Area – A designated area for trail assembly of fabricated components. Proper alignment, bolt holes matching and dimensional accuracy is being maintained along with a proper match marking, before dispatch to site. ![]() ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 15. Stacking Area – For storage of raw material, semi-finish and finish goods. A well planned stacking area with traceability record and facilitate material movement with ease for loading and unloading. ![]() ![]() |
| Fabrication facilities (for each unit) | Facilities including details of machinery & plant as applicable | 16. Overhead Lifting Cranes with capacity of 20MT (Min.) – For handling of material at various stages like cutting, fit-up, welding, trial assembly, loading and unloading purposes. These cranes facilitate safe and smooth movement of material & reduce manual handling. ![]() |
| Fabrication facilities (for each unit) | Facilities including software and staff available for 2D/3D Modelling and Drawings. | List of Software Available: 1. AutoCAD 2. Tekla Structures ![]() ![]() |
| Fabrication facilities (for each unit) | Details of RDSO approval (Item Name & Item No. for which approved) | 1. Registration ID – 1055635 2. Annual production capacity – 3000 MT 3. last quality audit done on – 14/07/2025 4. Next quality audit due date on – 10/07/2030 |
| Fabrication facilities (for each unit) | Firm's Registration details (under the Company Act/The Micro, Small and Medium Enterprises Development Act) | 1. Udyam Registration No. – UDYAM-DL-06-0018771 2. GSTIN No. – 06AAGCB3178B1Z0 |
| Fabrication facilities (for each unit) | Firm’s Registration details (under the Company Act/The Micro, Small and Medium Enterprises Development Act) | 1. Udyam Registration No. – UDYAM-DL-06-0018771 2. GSTIN No. – 06AAGCB3178B1Z0 |
| Fabrication facilities (for each unit) | Factory License Details | 1. Registration No. – SPT-ONLINE-CHD-K-423 2. Date of Issue – 06/10/2023 3. Valid Till – 31/12/2027 |
| Fabrication facilities (for each unit) | ISO 9001 Certification | 1. Certifying body – TUV INDIA PVT. LTD. 2. Date of certification – 19.07.2025 3. Last date of surveillance audit – 12.07.2025 4. Last date of internal audit with details of compliances – 05.07.2025 To 10.07.2025 (No minor or major non-conformity found) |
| Fabrication facilities (for each unit) | Organisation chart (as per given template), qualifications and experience details (in brief) | Organisation Chart & List of Staff with qualification and experience ![]() ![]() |
| Fabrication facilities (for each unit) | Details of testing facilities (Physical, Chemical, Mechanical, DPT, UT/PAUT/RT) | i) Physical, Chemical and Mechanical - Outsourced, MOU with Gravity Consultancy Services ii) DPT - Inhouse iii) UT/PAUT/RT - Outsourced, MOU with Gravity Consultancy Services ![]() |
| Fabrication facilities (for each unit) | Mandatory approvals | NABL, AERB, ASNT etc. i) NABL – Certificate of testing facility for Gravity Consultancy Services ii) AERB - Certificate iii) ASNT – Level II certificate for RT, UT, DPT and MPI. |
| Fabrication facilities (for each unit) | Mandatory approvals | NABL, AERB, ASNT etc. i) NABL – Certificate of testing facility for Gravity Consultancy Services ii) AERB - Certificate iii) ASNT – Level II certificate for RT, UT, DPT and MPI. ![]() ![]() |
| Fabrication facilities (for each unit) | Mandatory approvals | NABL, AERB, ASNT etc. i) NABL – Certificate of testing facility for Gravity Consultancy Services ii) AERB - Certificate iii) ASNT – Level II certificate for RT, UT, DPT and MPI. ![]() ![]() |
| Fabrication facilities (for each unit) | Artisans involved in cutting, drilling, welding, blasting, metalizing and painting etc. | a. List Of Artisans ![]() |
| Fabrication facilities (for each unit) | Artisans involved in cutting, drilling, welding, blasting, metalizing and painting etc. | a. Welding Supervisor and Welders Certificates ![]() |
| Fabrication facilities (for each unit) | Power Demand & Installed Power Supply | 1. Contract Demand - 125 kV ![]() |
| Fabrication facilities (for each unit) | Details of Executed Works/Supplies in Last 5 Years (in Nos. of spans /tonnage /Nos) | ![]() |
| Fabrication facilities (for each unit) | Works in hand (in Nos. of spans /tonnage /Nos) | ![]() |